Question 1 1.

In addition to the requirements of the International Fire Code, the installation and operation of industrial ovens and furnaces are required to comply with which standard?

Question 2 2.

Where an enclosed room or basement contains an industrial oven, ventilation air must be provided in accordance with which code?

Question 3 3.

During a plan review for an industrial baking oven installed beneath a heavy timber roof assembly, the fire code official must verify that the oven roof and floor are sufficiently insulated and ventilated to prevent temperatures at combustible ceilings and floors from exceeding what maximum temperature?

Question 4 4.

What is the standard maximum allowable distance from the appliance served for manual valves on fuel supply lines serving an industrial furnace?

Question 5 5.

A metal parts manufacturing facility installs a gas-fired annealing furnace where a fuel supply line shutoff valve cannot be placed within 6 feet of the unit. Under what condition does the code permit this exception?